Scope: Analyze, study and provide solutions to increase the efficiency of the Abhar 7 MW Solar Power Plant
Specification:
The scope of work was the review of technical documents, site visit and review the site equipment in order to identify defects, prepare a diagnostic report and provide the necessary solutions to improve the power plant efficiency.