Bandar Abbas Refinery Gasoline Production Increase Project





Project Info
- Client: Fanavaran Tehran Farayand Co.
- Location: Bandar Abbas
- Project: Bandar Abbas Refinery Gasoline Production Increase Project
- Progress: Completed – (2016- 2017)
- Scope: Installation and commissioning of Instrumentation equipment for cooling water system in Bandar Abbas refinery gasoline production increase project
Specification:
In this project, the EPC contractor was Fanavaran Tehran Farayand Company and our scope of work as his sub-contractor was the installation of instruments, control panels, cabling and cabling accessories and commissioning and start-up of the plant
