Persian Golf Gas Condensate Refinery -360,000 Barrel/Day




Project Info
- Client: Farab Construction Co. (Notash Afra Co.)
- Location: Bandar Abbas
- Project: Persian Golf Gas Condensate Refinery -360,000 Barrel/Day
- Progress: Completed – (2017- 2018)
- Scope: Removing and Clearance of installation punches of electrical and Instrumentation equipment in
Bandar Abbas Gas Condensate Refinery Project and performing all required ICAPS activities.
Specification:
Considering the construction and commissioning stage of the plant, this project consist of all activities related to clearance of installation punches for all electrical equipment in 23 substations as well as electrical, instrumentation and telecom equipment in the field which includes the following stages:
Analyzing the punches and estimating the required activities needed for clearing them by Engineering Department at site base on the project ICAPS data base.
Performing the filed activities by execution team.
Performance of the official procedures and documentations for registering the cleared punches.