Bandar Abbas Refinery Gasoline Production Increase Project

Project Info

  • Client: Fanavaran Tehran Farayand Co.
  • Location: Bandar Abbas
  • Project: Bandar Abbas Refinery Gasoline Production Increase Project
  • Progress: Completed – (2016- 2017)
  • Scope: Installation and commissioning of Instrumentation equipment for cooling water system in Bandar Abbas refinery gasoline production increase project

Specification:

In this project, the EPC contractor was Fanavaran Tehran Farayand Company and our scope of work as his sub-contractor was the installation of instruments, control panels, cabling and cabling accessories and commissioning and start-up of the plant